Concrete Slab Calculator

Cubic yards and bag count for slabs, pads, and footings.

Enter your slab dimensions to get the concrete volume in cubic yards plus how many 60-lb or 80-lb bags it would take for smaller pours.

Too big to DIY? Get matched with top-rated local pros

Enter your ZIP and we'll connect you with highly-rated local pros for concrete when they're available in your area — free, no obligation.

Bags vs. ready-mix

An 80-lb bag of concrete yields about 0.6 cu ft; a 60-lb bag about 0.45 cu ft. Small pads can be bagged, but anything over roughly a cubic yard is cheaper and easier as ready-mix delivery.

Reading your slab in cubic yards

Concrete is ordered by the cubic yard for ready-mix and by the bag for small pours, so start with volume: length × width × thickness (converted to feet). A 10×10 patio at 4 inches is about 1.23 cubic yards. Because trucks and bags both deal in whole units, always round up and add a cushion — 5–10% for a slab-on-grade, more if your subgrade is uneven and the forms might bow. Nobody wants to be short three bags with a half-mixed load setting up in the wheelbarrow. Our calculator gives you cubic yards plus the exact 60-lb and 80-lb bag counts for smaller jobs.

When to switch from bags to ready-mix

An 80-lb bag yields about 0.6 cubic feet, so a single cubic yard takes 45 of them — that's a full day of mixing and a sore back. The practical break-even is around one cubic yard: below it, bagging is cheaper and you control the pace; above it, a ready-mix truck is faster, more consistent, and usually cheaper per yard. Most suppliers have a short-load minimum (often 1 yard) and charge extra below full loads, so price it both ways. For anything structural or over a couple yards, order the truck and spend your energy on finishing instead of mixing.

Thickness, base, and reinforcement

Four inches is the standard for patios, walkways, and shed floors; driveways and anything carrying vehicle weight want 5–6 inches. Just as important is what's underneath: 4 inches of compacted gravel base gives the slab uniform support and drainage so it doesn't crack and heave. Add welded wire mesh or rebar on a chair so it sits in the middle of the slab, not on the ground. And plan your control joints — tooled or saw-cut grooves about every 8–10 feet — because concrete will crack, and joints decide whether it cracks where you want it to or randomly across your new patio.

FAQ

How thick should a concrete slab be?
4 inches is standard for patios and walkways; 5–6 inches for driveways or anything bearing vehicle weight.
How many 80-lb bags of concrete are in a yard?
About 45 bags of 80-lb mix make one cubic yard, or roughly 60 of the 60-lb bags. That's why pours bigger than a cubic yard almost always make more sense as ready-mix delivery.
How thick should a concrete driveway be?
Plan 5–6 inches for a residential driveway, over a 4-inch compacted gravel base, with rebar or wire mesh. Four inches is fine for patios and walkways that only see foot traffic, but it's too thin to carry vehicles reliably.
Do I need gravel under a concrete slab?
Yes, in almost all cases. A 4-inch compacted gravel base provides drainage, prevents the slab from sitting in water, and gives uniform support so it doesn't settle unevenly and crack. Skipping it is one of the most common causes of failed slabs.