Concrete Slab Calculator
Cubic yards and bag count for slabs, pads, and footings.
Enter your slab dimensions to get the concrete volume in cubic yards plus how many 60-lb or 80-lb bags it would take for smaller pours.
Too big to DIY? Get matched with top-rated local pros
Enter your ZIP and we'll connect you with highly-rated local pros for concrete when they're available in your area — free, no obligation.
Bags vs. ready-mix
An 80-lb bag of concrete yields about 0.6 cu ft; a 60-lb bag about 0.45 cu ft. Small pads can be bagged, but anything over roughly a cubic yard is cheaper and easier as ready-mix delivery.
Reading your slab in cubic yards
Concrete is ordered by the cubic yard for ready-mix and by the bag for small pours, so start with volume: length × width × thickness (converted to feet). A 10×10 patio at 4 inches is about 1.23 cubic yards. Because trucks and bags both deal in whole units, always round up and add a cushion — 5–10% for a slab-on-grade, more if your subgrade is uneven and the forms might bow. Nobody wants to be short three bags with a half-mixed load setting up in the wheelbarrow. Our calculator gives you cubic yards plus the exact 60-lb and 80-lb bag counts for smaller jobs.
When to switch from bags to ready-mix
An 80-lb bag yields about 0.6 cubic feet, so a single cubic yard takes 45 of them — that's a full day of mixing and a sore back. The practical break-even is around one cubic yard: below it, bagging is cheaper and you control the pace; above it, a ready-mix truck is faster, more consistent, and usually cheaper per yard. Most suppliers have a short-load minimum (often 1 yard) and charge extra below full loads, so price it both ways. For anything structural or over a couple yards, order the truck and spend your energy on finishing instead of mixing.
Thickness, base, and reinforcement
Four inches is the standard for patios, walkways, and shed floors; driveways and anything carrying vehicle weight want 5–6 inches. Just as important is what's underneath: 4 inches of compacted gravel base gives the slab uniform support and drainage so it doesn't crack and heave. Add welded wire mesh or rebar on a chair so it sits in the middle of the slab, not on the ground. And plan your control joints — tooled or saw-cut grooves about every 8–10 feet — because concrete will crack, and joints decide whether it cracks where you want it to or randomly across your new patio.
FAQ