Sod Calculator
How many sod pallets your lawn needs — and the cost.
Measure your lawn area and this tells you how many sod pallets to order (with a waste allowance) and the estimated cost.
Too big to DIY? Get matched with top-rated local pros
Enter your ZIP and we'll connect you with highly-rated local pros for sod when they're available in your area — free, no obligation.
How much sod do I need?
A standard sod pallet covers about 450 square feet. We add 5% for cuts around curves and obstacles, then round up to whole pallets since sod is sold by the pallet.
Measuring an irregular lawn for sod
Lawns are rarely perfect rectangles, so break yours into shapes you can measure: rectangles, triangles, and circles, then add them up. For curved borders, measure the longest and widest points and treat the area as a rectangle — the small overage covers the pieces you'll trim to the curve. Our calculator automatically adds 5% for waste, which handles the cuts around flower beds, trees, and walkways. If your yard has lots of curves, tight corners, or obstacles, bump that to 10% mentally and order one extra piece or partial pallet. Running short mid-install means a second trip and a visible seam where fresh sod meets day-old sod.
Laying sod so the seams disappear
Sod is perishable — it should go down within 24 hours of delivery, sooner in summer heat. Prep first: kill or remove the old grass, till or rake the top inch of soil, and grade it smooth and slightly below any hardscape so the finished turf sits flush. Lay the first row against a straight edge like a driveway, then stagger each following row like bricks so the short seams don't line up. Butt the edges tight without overlapping, and use a sharp knife to cut around curves. Roll the whole lawn to press roots into contact with the soil, then water immediately.
The first two weeks make or break it
Freshly laid sod has almost no roots, so water is everything. Soak it thoroughly right after installation until the soil beneath is wet a couple inches down, then water lightly twice a day for the first week to keep the sod and soil moist but not swampy. Taper to once a day in week two, then back off as the roots take hold — tug a corner around day 14, and if it resists, it's rooting. Stay off it as much as possible for the first two to three weeks. Wait until you've mowed two or three times before any heavy traffic or fertilizer.
FAQ
Spot an error, or want a calculator we don't have yet? Send feedback →